<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Castle Village &#187; 140</title>
	<atom:link href="http://www.castlevillage.org/category/buildings/140/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.castlevillage.org</link>
	<description>Website of the Castle Village Owners Corporation</description>
	<lastBuildDate>Mon, 30 Jan 2012 22:27:52 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3</generator>
		<item>
		<title>Masonry Work &#8211; 140 &#8220;4&#8243; Line Residents</title>
		<link>http://www.castlevillage.org/2012/01/masonry-work-140-4-line-residents/</link>
		<comments>http://www.castlevillage.org/2012/01/masonry-work-140-4-line-residents/#comments</comments>
		<pubDate>Mon, 30 Jan 2012 21:19:46 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=2090</guid>
		<description><![CDATA[The contractor has mobilized scaffolding to commence work on Monday 1/29 along the 4-line as indicated below. The proposed work consists of demolition and reconstruction of brick at several floors along this drop. You can expect periods of loud noise due to the demolition for three weeks or longer if additional work is encountered. Please [...]]]></description>
			<content:encoded><![CDATA[<p>The contractor has mobilized scaffolding to commence work on Monday 1/29 along the<br />
4-line as indicated below.  The proposed work consists of demolition and reconstruction of brick at several floors along this drop.  You can expect periods of loud noise due to the demolition for three weeks or longer if additional work is encountered.  Please advise if you are experiencing water infiltration along the proposed drop.</p>
<p>Work will start at 9:00am and will close at 5:00pm Monday thru Friday.  If<br />
necessary to advance the schedule, work will be allowed on Saturday.  Saturday work consists of drilling noise but loud hammer demolition work, will not be allowed.</p>
<p>Precautions/Procedures<br />
•	If you are in proximity to the work area, keep your windows closed to avoid dust and debris from entering.<br />
•	Air conditioners will be protected with a filter fabric but it is best to avoid using them during the demolition if possible.<br />
•	In some cases, an air conditioner will have to be removed to properly perform the work required.<br />
•	To avoid possible damage to window and adjoining wall decorations, remove breakable items from these areas.<br />
•	Because of the bonded wall construction of our buildings, damage to interior surfaces of your apartment may occur during demolition.  Any damage to the interior will be repaired.<br />
We apologize for any inconvenience this may cause but the work is necessary to preserve the integrity of your building.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2012/01/masonry-work-140-4-line-residents/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>140 Water Shut Down</title>
		<link>http://www.castlevillage.org/2012/01/140-water-shut-down-15/</link>
		<comments>http://www.castlevillage.org/2012/01/140-water-shut-down-15/#comments</comments>
		<pubDate>Fri, 06 Jan 2012 18:19:20 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=2058</guid>
		<description><![CDATA[THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on WEDNESDAY, JANUARY 11TH DUE TO THE NEED FOR PLUMBING REPAIRS. REMINDER… PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS ARE SECURELY TURNED OFF! Saving Tip Don&#8217;t use the toilet as a wastebasket, &#038; don&#8217;t flush it unnecessarily.]]></description>
			<content:encoded><![CDATA[<p>THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on WEDNESDAY, JANUARY 11TH DUE TO THE NEED FOR PLUMBING REPAIRS. </p>
<p>REMINDER…<br />
PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS<br />
ARE SECURELY TURNED OFF!</p>
<p>Saving Tip<br />
Don&#8217;t use the toilet as a wastebasket, &#038; don&#8217;t flush it unnecessarily.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2012/01/140-water-shut-down-15/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>140 Masonry Work on &#8220;1&#8243; Line</title>
		<link>http://www.castlevillage.org/2011/12/140-masonry-work-on-1-line/</link>
		<comments>http://www.castlevillage.org/2011/12/140-masonry-work-on-1-line/#comments</comments>
		<pubDate>Fri, 30 Dec 2011 21:01:06 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=2048</guid>
		<description><![CDATA[The contractor has mobilized scaffolding to commence work on Wednesday 1/4/12 along the 1-line as indicated below. The proposed work consists of demolition and reconstruction of brick at several locations from floors 7 thru 13. You can expect loud noise due to the demolition periodically for 3 weeks or longer if additional work is encountered. [...]]]></description>
			<content:encoded><![CDATA[<p>The contractor has mobilized scaffolding to commence work on Wednesday 1/4/12 along the 1-line as indicated below.  The proposed work consists of demolition and reconstruction of brick at several locations from floors 7 thru 13.  You can expect loud noise due to the demolition periodically for 3 weeks or longer if additional work is encountered.  Ear plugs are available if you find the noise overwhelming; call the office for a pair.  Please advise if you are experiencing water infiltration along the proposed drop.</p>
<p>Work will start at 8:00am and will close at 4:30pm Monday thru Friday.  If<br />
necessary to advance the schedule, work will be allowed on Saturday.  Saturday work consists of drilling noise but loud hammer demolition work, will not be allowed.</p>
<p>Precautions/Procedures<br />
•	If you are in proximity to the work area, keep your windows closed to avoid dust and debris from entering.  Ear plugs are available to attenuate the noise.<br />
•	Air conditioners will be protected with a filter fabric but it is best to avoid using them during the demolition if possible.<br />
•	In some cases, an air conditioner will have to be removed to properly perform the work required.<br />
•	To avoid possible damage to window and adjoining wall decorations, remove breakable items from these areas.<br />
•	Because of the bonded wall construction of our buildings, damage to interior surfaces of your apartment may occur during demolition.  Any damage to the interior will be repaired.<br />
We apologize for any inconvenience this may cause but the work is necessary to preserve the integrity of your building.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/12/140-masonry-work-on-1-line/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>140 Water Shut Down</title>
		<link>http://www.castlevillage.org/2011/12/140-water-shut-down-14/</link>
		<comments>http://www.castlevillage.org/2011/12/140-water-shut-down-14/#comments</comments>
		<pubDate>Wed, 21 Dec 2011 14:39:59 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=2035</guid>
		<description><![CDATA[THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on THURSDAY, DECEMBER 22ND DUE TO THE NEED FOR PLUMBING REPAIRS. We regret any inconvenience And appreciate your understanding. REMINDER… PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS ARE SECURELY TURNED OFF! Do take short showers and save 5 to 7 gallons a minute.]]></description>
			<content:encoded><![CDATA[<p>THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on THURSDAY, DECEMBER 22ND DUE TO THE NEED FOR PLUMBING REPAIRS. </p>
<p>We regret any inconvenience<br />
And appreciate your understanding.</p>
<p>REMINDER…<br />
PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS<br />
ARE SECURELY TURNED OFF!</p>
<p>Do take short showers and save 5 to 7 gallons a minute.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/12/140-water-shut-down-14/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>140 Water Shut Down</title>
		<link>http://www.castlevillage.org/2011/12/140-water-shut-down-13/</link>
		<comments>http://www.castlevillage.org/2011/12/140-water-shut-down-13/#comments</comments>
		<pubDate>Mon, 12 Dec 2011 18:39:45 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=2018</guid>
		<description><![CDATA[THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on WEDNESDAY, DECEMBER 14TH DUE TO THE NEED FOR PLUMBING REPAIRS. We regret any inconvenience And appreciate your understanding. REMINDER… PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS ARE SECURELY TURNED OFF! Do take short showers and save 5 to 7 gallons a minute.]]></description>
			<content:encoded><![CDATA[<p>THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on WEDNESDAY, DECEMBER 14TH DUE TO THE NEED FOR PLUMBING REPAIRS. </p>
<p>We regret any inconvenience<br />
And appreciate your understanding.</p>
<p>REMINDER…<br />
PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS ARE SECURELY TURNED OFF!</p>
<p>Do take short showers and save 5 to 7 gallons a minute.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/12/140-water-shut-down-13/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>140 Emergency Water Shutdown</title>
		<link>http://www.castlevillage.org/2011/11/140-emergency-water-shutdown/</link>
		<comments>http://www.castlevillage.org/2011/11/140-emergency-water-shutdown/#comments</comments>
		<pubDate>Wed, 30 Nov 2011 19:07:49 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=2000</guid>
		<description><![CDATA[THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on THURSDAY, DECEMBER 1ST DUE TO THE NEED FOR EMERGENCY PLUMBING REPAIRS. We regret any inconvenience And appreciate your understanding. REMINDER… PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS ARE SECURELY TURNED OFF! ENERGY SAVING TIP Do take short showers and save 5 to 7 gallons [...]]]></description>
			<content:encoded><![CDATA[<p>THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on THURSDAY, DECEMBER 1ST DUE TO THE NEED FOR EMERGENCY PLUMBING REPAIRS. </p>
<p>We regret any inconvenience<br />
And appreciate your understanding.</p>
<p>REMINDER…<br />
PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS ARE SECURELY TURNED OFF!</p>
<p>ENERGY SAVING TIP<br />
Do take short showers and save 5 to 7 gallons a minute.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/11/140-emergency-water-shutdown/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Exterior Masonry Work &#8211; 140 &#8211; Residents of 1 &amp; 2 line</title>
		<link>http://www.castlevillage.org/2011/11/exterior-masonry-work-140-residents-of-1-2-line/</link>
		<comments>http://www.castlevillage.org/2011/11/exterior-masonry-work-140-residents-of-1-2-line/#comments</comments>
		<pubDate>Fri, 11 Nov 2011 14:43:20 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=1988</guid>
		<description><![CDATA[The contractor has mobilized scaffolding to commence work on Monday 11/14 along the 1 &#038; 2-lines as indicated below. The proposed work consists of demolition and reconstruction of brick primarily along the 10th floor. You can expect loud noise due to the demolition periodically over two weeks or longer if additional work is encountered. Please [...]]]></description>
			<content:encoded><![CDATA[<p>The contractor has mobilized scaffolding to commence work on Monday 11/14 along the<br />
1 &#038; 2-lines as indicated below.  The proposed work consists of demolition and reconstruction of brick primarily along the 10th floor.  You can expect loud noise due to the demolition periodically over two weeks or longer if additional work is encountered.  Please advise if you are experiencing water infiltration along the proposed drop.</p>
<p>Work will start at 9:00am and will close at 4:30pm Monday thru Friday.  If<br />
necessary to advance the schedule, work will be allowed on Saturday.  Saturday work consists of drilling noise but loud hammer demolition work, will not be allowed.</p>
<p>Precautions/Procedures<br />
•	If you are in proximity to the work area, keep your windows closed to avoid dust and debris from entering.<br />
•	Air conditioners will be protected with a filter fabric but it is best to avoid using them during the demolition if possible.<br />
•	In some cases, an air conditioner will have to be removed to properly perform the work required.<br />
•	To avoid possible damage to window and adjoining wall decorations, remove breakable items from these areas.<br />
•	Because of the bonded wall construction of our buildings, damage to interior surfaces of your apartment may occur during demolition.  Any damage to the interior will be repaired.<br />
We apologize for any inconvenience this may cause but the work is necessary to preserve the integrity of your building.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/11/exterior-masonry-work-140-residents-of-1-2-line/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Exterior Masonry Work &#8211; 140 &#8211; Residents of 4 line</title>
		<link>http://www.castlevillage.org/2011/11/exterior-masonry-work-140-residents-of-4-line/</link>
		<comments>http://www.castlevillage.org/2011/11/exterior-masonry-work-140-residents-of-4-line/#comments</comments>
		<pubDate>Fri, 11 Nov 2011 14:41:43 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=1984</guid>
		<description><![CDATA[The contractor has mobilized scaffolding to commence work on Monday 11/14 along the 4-line as indicated below. The proposed work consists of demolition and reconstruction of brick primarily at several floors along this drop. You can expect loud noise due to the demolition periodically three weeks or longer if additional work is encountered. Please advise [...]]]></description>
			<content:encoded><![CDATA[<p>The contractor has mobilized scaffolding to commence work on Monday 11/14 along the<br />
4-line as indicated below.  The proposed work consists of demolition and reconstruction of brick primarily at several floors along this drop.  You can expect loud noise due to the demolition periodically three weeks or longer if additional work is encountered.  Please advise if you are experiencing water infiltration along the proposed drop.</p>
<p>Work will start at 9:00am and will close at 4:30pm Monday thru Friday.  If<br />
necessary to advance the schedule, work will be allowed on Saturday.  Saturday work consists of drilling noise but loud hammer demolition work, will not be allowed.</p>
<p>Precautions/Procedures<br />
•	If you are in proximity to the work area, keep your windows closed to avoid dust and debris from entering.<br />
•	Air conditioners will be protected with a filter fabric but it is best to avoid using them during the demolition if possible.<br />
•	In some cases, an air conditioner will have to be removed to properly perform the work required.<br />
•	To avoid possible damage to window and adjoining wall decorations, remove breakable items from these areas.<br />
•	Because of the bonded wall construction of our buildings, damage to interior surfaces of your apartment may occur during demolition.  Any damage to the interior will be repaired.<br />
We apologize for any inconvenience this may cause but the work is necessary to preserve the integrity of your building.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/11/exterior-masonry-work-140-residents-of-4-line/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>140 Cable Internet Connections</title>
		<link>http://www.castlevillage.org/2011/09/140-cable-internet-connections/</link>
		<comments>http://www.castlevillage.org/2011/09/140-cable-internet-connections/#comments</comments>
		<pubDate>Thu, 29 Sep 2011 20:40:46 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=1885</guid>
		<description><![CDATA[Pursuant the Board of Director’s memo of 9/14/11, Castle Village Internet Cable installations will begin in building 140 on Monday, October 3rd. The installations will be performed by experienced installers working for Panix, the company that will be providing the Internet service. The workmen will be accompanied by Castle Village staff during the installation when [...]]]></description>
			<content:encoded><![CDATA[<p>Pursuant the Board of Director’s memo of 9/14/11, Castle Village Internet Cable installations will begin in building 140 on Monday, October 3rd.  </p>
<p>The installations will be performed by experienced installers working for Panix, the company that will be providing the Internet service.  The workmen will be accompanied by Castle Village staff during the installation when no one is home.  The installation involves extending a cable from just outside and above your apartment entrance door to a convenient location in your home where you have your main computer or router set up (a router is required for wireless computing).  This point should be no more than 50 feet from the entrance and, for best results, should be centrally located for wireless computing.  The cable will be run along your baseboard or picture frame molding and terminated in a jack that resembles a typical phone jack and is best located near your baseboard molding.  If you are not going to be home during the installation, please make it clear where you want the jack to be installed by leaving instructions and markers.  </p>
<p>The intention is to complete 8 to 16 installations per day starting at the penthouse level and moving down the building one to two floors per day.  The table below shows the schedule the workmen will try to follow.  The schedule might change once the work begins and completion times are established.  Keeping to the schedule also relies on your cooperation.  Please make your apartment available on the days that correspond to your floor.  Please let the management office know how access to your apartment will be arranged.  If you cannot provide access during the time allotted for your floor, let us know in advance and we will try to accommodate your schedule.  Installations can also be arranged on weekends and after work hours by in-house staff.  </p>
<p>Monday – 10/3 &#8211; PH  &#038; 12th Floor<br />
Tuesday – 10/4 – 11th &#038; 10th Floor<br />
Wednesday – 10/5 – 9th &#038; 8th<br />
Thursday – 10/6 – 7th &#038; 6th Floor<br />
Friday – 10/7 – 5th &#038; 4th Floor<br />
Monday – 10/10 &#8211; HOLIDAY<br />
Tuesday, 10/11 – 3rd &#038; 2nd Floor<br />
Wednesday, 10/12 – 1st &#038; Sublevel</p>
<p>	PRECAUTIONS<br />
•	Please clear a path to where you would like the jack placed and remove furniture and breakables from the walls.<br />
•	If there is heavy furniture that you have trouble moving, let us know in advance so staff can be prepared to help.</p>
<p>You are not obliged to have the cable installed but you will not be able to access the Castle Village Internet Service from your home without it.  If you choose not to, please call the management office and advise accordingly.</p>
<p>Let us know if you were a VZAvenue subscriber.  If your cable is intact, you can check your connection by simply plugging the old cable into your computer or router.  You should be able to reach the web site http://castlevillage.panix.com (and nothing else).  If you can, you will not need to make an appointment and you are ready to go once internet service is activated.  If you cannot reach this site, let us know and we will check the connection.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/09/140-cable-internet-connections/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Exterior Masonry Work &#8211; &#8220;7 &amp; 8&#8243; Lines</title>
		<link>http://www.castlevillage.org/2011/09/exterior-masonry-work-7-8-lines/</link>
		<comments>http://www.castlevillage.org/2011/09/exterior-masonry-work-7-8-lines/#comments</comments>
		<pubDate>Fri, 23 Sep 2011 20:18:58 +0000</pubDate>
		<dc:creator>sashagaertner</dc:creator>
				<category><![CDATA[140]]></category>
		<category><![CDATA[Work Notice]]></category>

		<guid isPermaLink="false">http://www.castlevillage.org/?p=1866</guid>
		<description><![CDATA[The contractor has mobilized scaffolding to commence work on Tuesday 9/27 along the 7 &#038; 8-lines as indicated below. The proposed work consists of demolition and reconstruction of brick at several locations from floors 1 thru 13. You can expect loud noise due to the demolition periodically for five weeks or longer if additional work [...]]]></description>
			<content:encoded><![CDATA[<p>The contractor has mobilized scaffolding to commence work on Tuesday 9/27 along the 7 &#038; 8-lines as indicated below.  The proposed work consists of demolition and reconstruction of brick at several locations from floors 1 thru 13.  You can expect loud noise due to the demolition periodically for five weeks or longer if additional work is encountered.  Please advise if you are experiencing water infiltration along the proposed drop.</p>
<p>Work will start at 8:00am and will close at 5:30pm Monday thru Friday.  If<br />
necessary to advance the schedule, work will be allowed on Saturday.  Saturday work consists of drilling noise but loud hammer demolition work, will not be allowed.</p>
<p>Precautions/Procedures<br />
•	If you are in proximity to the work area, keep your windows closed to avoid dust and debris from entering.<br />
•	Air conditioners will be protected with a filter fabric but it is best to avoid using them during the demolition if possible.<br />
•	In some cases, an air conditioner will have to be removed to properly perform the work required.<br />
•	To avoid possible damage to window and adjoining wall decorations, remove breakable items from these areas.<br />
•	Because of the bonded wall construction of our buildings, damage to interior surfaces of your apartment may occur during demolition.  Any damage to the interior will be repaired.<br />
We apologize for any inconvenience this may cause but the work is necessary to preserve the integrity of your building.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.castlevillage.org/2011/09/exterior-masonry-work-7-8-lines/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

