Residents of 140 – Cogen & Emergency Backup Installation

The Cogen and Emergency Backup Power installation that is part of the Energy Reduction Plan is nearing completion. All equipment is in place but final electrical tie-ins to building systems remain to be done. In order to do these connections safely, the power to the common areas and to the building systems must be shut [...]

140 & 160 Laundry Room Closing

The laundry room will be CLOSED most of the day on Friday, August 6th due to Con Edison working on the gas lines. We regret any inconvenience and thank you for your understanding.

140 – Thermostatic Radiator Valve Installation

As announced in our memo of June 11th, Thermostatic Radiator Valves (TRVs) will be installed on all radiators in your apartment except those found in the bathrooms. A TRV is a self-regulating valve that replaces your existing manual radiator valve. It acts as a thermostat to control the temperature of a room. You need only [...]

140 Energy Project

SATURDAY CONSTRUCTION In an effort to complete the energy project on schedule, the contractor will be working in the basement area of your building this Saturday April 24th. There will be intermittent noise associated with this work. We regret any inconvenience this work may cause.

140 – Hot Water Shut Down

THE HOT WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 3:00PM on TUESDAY, APRIL 27TH DUE TO THE NEED FOR PLUMBING REPAIRS. We regret any inconvenience And appreciate your understanding.

140 “9″ line Plumbing Repair

Please be advised that there will be plumbing repairs done on the kitchen drain line on Tuesday, April 13th The kitchen sink can not be used during the hours of 9am-1pm as doing so will result in a leak which will in turn cause the water supply to the whole building to be turned off. [...]

140 Sublevel Submetering

As you know, the installation of the current measuring devices called donuts over the wires that feed your apartment was not completed on the date scheduled. The reason is that the sublevel circuits are tied to the house supply instead of the apartment supply in the basement. As long as we were master metered, there [...]

140 Submetering – Donut Installation

On Wednesday March 17, 2010, the submetering contractor will begin installing the current measuring devices called donuts over the wires that feed your apartment. It is extremely important for billing purposes that the donuts be placed around the correct wires for each apartment. A survey of the electric panels shows that most of the breakers [...]

Health Club Update (New Enlgarged Gym Opening Soon!)

MAKE YOUR NEW YEAR’S RESOLUTION NOW. GET IN SHAPE IN THE NEW YEAR BY RENEWING YOUR MEMBERSHIP OR JOINING THE HEALTH CLUB The New Enlarged Gym Is Under Construction And Will Be Open For Your Use Shortly Into The New Year With Exciting New State Of The Art Equipment. Matrix Tx7e Treadmill • Integrated 15″ [...]

140 Water Shut Down

THE WATER WILL BE OFF FROM APPROXIMATELY 9:00AM TO 1:00PM on WEDNESDAY, DECEMBER 16TH DUE TO THE NEED FOR PLUMBING REPAIRS. REMINDER… PLEASE BE SURE THAT ALL HOUSEHOLD FAUCETS ARE SECURELY TURNED OFF! Saving Tip: Do fill the tub halfway and save 10 to 15 gallons.