Castle Village

Site search

Site menu:

 

Recent Posts

Residents of 120 – Cogen & Emergency Backup Installation

The Cogen and Emergency Backup Power installation that is part of the Energy Reduction Plan is nearing completion. All equipment is in place but final electrical tie-ins to building systems remain to be done. In order to do these connections safely, the power to the common areas and to the building systems must be shut down. This shut down only affects common area lighting, elevators, the laundry room and basement.
You will not lose power to your apartments during this time.
The shut down is scheduled for 10am on Monday August 30th and should last about two hours. Emergency lighting will be activated in the stairwells and additional lighting will be deployed on the landings and in the lobby. If you need to do laundry or access the basement for any other reason, please do so and complete your task before 10am. If you have appointments outside the building, we suggest you leave the building before 10am and return after 1pm. If you must leave the building for an emergency during the shut down and need assistance, please let your doorman know or call the management office.
We regret any inconvenience this power loss may cause.