Building 180 – 1 & 9 Line Residents
Starting today July 1st, L&Z Building Restoration will be working along the 1 & 9-lines as indicated below. The work consists of caulking windows, brick demolition and reconstruction at several apartments along the drop shown. You can expect periods of loud noise due to the demo, which will start on July 6th and continue through July 23rd.
Work will start at 8:00am and will close at 5:30pm Monday thru Friday. If necessary, quiet work will be allowed on Saturday.
Precautions/Procedures
• Keep your windows closed to avoid dust and debris from entering.
• Air conditioners will be protected with a filter fabric but it is best to avoid using them during the demolition if possible.
• In some cases, an air conditioner will have to be removed to properly perform the work required.
• To avoid possible damage to window and adjoining wall decorations, remove breakable items from these areas.
• Because of the bonded wall construction of our buildings, damage to interior surfaces of your apartment may occur during demolition. Any damage to the interior will be repaired.
We apologize for any inconvenience this may cause but the work is necessary to preserve the integrity of your building.
Posted: July 1st, 2010 under 180, News and Announcements, Work Notice.